Provision of development and maintenance services for the Investment Project Management Platform
At a glance
Centrum e-Zdrowia (Warszawa, Poland) is tendering: Provision of development and maintenance services for the Investment Project Management Platform. Offers are due 30 Nov 2026, 10:00 CET. Estimated value PLN 12.6m, 23-month contract. Bidders must show, among other things: ISO 22301, ISO 27001, ISO 9001, references, key people.
Published on:TEDe-Zamowienia (postepowanie)
Already a customer? Open it in the app
Translated from the official notice. The original text is the legally binding one.
Free · no account
Get tenders like this one by e-mail
Key facts
- Deadline
- PLN 12.6m
- Estimated value
- 23 months
- Duration
- Open procedure
- Procedure
- 13 Nov 2026
- Published
- 791078-2026
- Notice number
- ZPRZ.270.309.2026
- Reference number
- IT services: consulting, software development, Internet and support (72000000)
- Main CPV
- PL911
- Place of performance (NUTS)
- not allowed
- Variant offers
- Polish
- Language of offers
Dates
Every date of the notice and its changes, in order. Times: Brussels / Warsaw.
Notice published
Deadline for offers
Opening of offers
Planned start of the contract
Offers binding until (computed)computed
90 days from the deadline for offers, per the notice
Planned end of the contract
What the buyer wants
- The subject of the contract is the provision of development and maintenance services for the Investment Project Support Platform (POPI).
- Detailed description of the subject matter of the contract is given in Annex 1 to the SWZ - Description of the subject matter of the contract and Annex 2 to the SWZ - Designed provisions of the contract.
- The Contractor is obliged to carry out the contract on the terms and conditions described in the Designed provisions of the Agreement which constitute Annex 2 to the SWZ.
CPV codes
- 72000000IT services: consulting, software development, Internet and supportmain
Conditions for participation & required documents
What the notice asks bidders to prove, and the documents it requires. Full text below.
Conditions in the notice
- CertificatesISO 22301 · ISO 27001 · ISO 9001
- ReferencesSimilar contracts delivered before
- Key peopleNamed roles, CVs or minimum team
Detected automatically in the published notice. Always confirm against the tender documents.
Show the notice text (4)
The Contractor shall comply with the condition of technical or professional capacity if it demonstrates that: a. in the last 3 years before the deadline for the submission of tenders, and if the term of business of the Contractor is shorter – during that period, and in the case of interim or continuous benefits, he performs, at least two contracts with a minimum value of PLN 3 000 000,00 gross each or one contract with a value of not less than PLN 6 000 000,00 gross in terms of analysis, construction and implementation or development of IT systems based on Microsoft Power Platform and .NET technology under which the Contractor has produced based on the requirements of the Counterparty software.
The contractor shall comply with the technical or professional capacity condition if it demonstrates that: b. has a Quality Management System implemented and maintained in accordance with the PN-EN ISO 9001 or equivalent standard. Compliance with the condition will be confirmed by presentation of a valid certificate issued by an accredited certification body or equivalent document confirming the application of the quality management system
The contractor shall comply with the condition of technical or professional capacity if it demonstrates that: c. has at least one of the following management systems implemented and maintained: - Information Security Management System according to PN-EN ISO/IEC 27001 or equivalent standard covering its scope of provision of IT services, or - Continuity Management System conforming to PN-EN ISO 22301 or equivalent standard covering its scope of provision of IT services.
The condition will be fulfilled by demonstrating that the Contractor has at least one of the above mentioned management systems. The fulfilment of the condition will be confirmed by presentation of a valid certificate issued by an accredited certification body or equivalent document, confirming the use by the Contractor of a management system complying with the requirements of PN-EN ISO/IEC 27001, PN-EN ISO 22301 or equivalent standard respectively.
The economic operator shall comply with the technical or professional capacity condition if it demonstrates that:
- it has persons capable of carrying out the subject-matter of the contract with professional qualifications, the experience necessary for the performance of the contract corresponding to the following conditions: Role: Consultant Minimum number of persons: 4 Required knowledge/competence from service provider, Minimum requirements/minimum experience: Practical knowledge of technology and experience in working with Power Platform
- 4 years Experience in the construction of canvas and model-driven
- 3 years Experience in building solutions using Power Portal
- 3 years Experience in building solutions using Power BI
- 3 years Knowledge of technology and experience in working with Power Automate
- 3 years Knowledge of technology and experience in working with Dataverse
- 3 years Knowledge of technology and experience in working with JavaScript and/or TypeScript
- 3 years Knowledge of technology and experience in working with C#
- 3 years Knowledge of technology and experience in working with Java
- 3 years Technology knowledge and experience in working with Python
- 3 years Knowledge of technology and experience in working with Azure Functions
- 3 years Knowledge of technology and experience in working with HTML, CSS
- 3 years Knowledge of technology and experience in working with Umbraco CMS
- 2 years Experience in working with the web services REST API
- 3 years Experience in working with Power Platform Connectors
- 2 years Experience in integration with the National Node (authentics of users using means of identification located on the National Node)
- 2 completed project Experience in integration with Szafir SDK (electronic signature of PDF documents)
- 1 completed project Experience in integration with FortiSandbox
- 1 completed project Experience in using and implementing solutions that integrate with Microsoft Copilot.
- 1 completed project Practical advanced knowledge of SQL
- 3 years The Contracting Authority shall inform that the requirements set out in the above table must be met by all persons indicated for the performance of the subject-matter of the contract together.
Options, renewals, framework
- Options: foreseen
This is how SalesDots checks this tender: the notice's conditions, this contract's own facts, the requirements typical for its category and your company's registers. The statuses below are an example; you see the real result after signing in.
2 met · 0 expiring · 4 missing · 6 to check
Conditions in this notice
- ISO 22301certificate in your profile, valid on the bid dateNot in your profile yet
- ISO 27001certificate in your profile, valid on the bid dateNot in your profile yet
- ISO 9001certificate in your profile, valid on the bid dateNot in your profile yet
- Key peopleyour team matched to the required rolesNot in your profile yet
- Referencessimilar contracts from your history matched to the conditionNeeds a look
This tender's facts
- Priceyour price against past winning bidsNeeds a look
- Time to resolve a Failure under the Maintenance Service (SU)evidence ready for this award criterionNeeds a look
- Time to restore System operation in the event of a P1 Failure related…evidence ready for this award criterionIn your profile
- Who wins at this buyerrecently: INTEGRITY PARTNERS SP. z o.o., IT Solution Factor Sp. z o.o. — 6 different winners in the last 6 awardsNeeds a look
Typical for: Software development
- Digital accessibility (WCAG 2.1)often required for public-sector systemsNeeds a look
- Copyright and source codetransfer of rights or a licence on the buyer's termsNeeds a look
- Secure developmentsecurity testing and OWASP practicesIn your profile
Registers — checked automatically
- KRS / CEIDG statuscompany active, representation matchesVerified
- NIP and VAT white listactive VAT payer, account listedVerified
- Beneficial owners (CRBR)filing matches KRSVerified
- EU VAT (VIES)number active in VIESVerified
- LEI (GLEIF)LEI issued and renewed, data matches the registerVerified
- Sanctions screeningcompany and owners not listedVerified
Free · no account
Get tenders like this one by e-mail
Free check · 10 seconds
Does your company fit this tender?
Award criteria
The full criteria and their weights, as published in the notice.
- Price
The evaluation of tenders submitted within the scope of the criterion The gross price will be made on the basis of the gross price given by the Contractor for the performance of the entire contract. This price shall be indicated in the tender form, the model of which is Annex 3 to the SWI. The scoring assessment under this criterion will be made according to the following formula: C = Price of the cheapest bid / Price of surveyed bid x 90 The maximum number of points to obtain in this criterion is 90,00.
- Time to restore System operation in the event of a P1 Failure related to a production change (SR)
Time to restore system operation in case of P1 failure associated with production change (SR) The point assessment in the criterion ‘Time to restore system operation in case of P1 failure associated with production change’ (SR) will be made on the basis of the maximum time of system operation declared by the Contractor in the Offer Form* in the case of P1 priority failure due to the implementation of the production change. According to the ODP, the required maximum recovery time for this type of accident is 2 hours, which is 120min. The contractor may offer shorter maximum recovery time, while for the evaluation of tenders The contracting authority shall assume that the shortest time scored is 1 hour, which shall be 60min. The score rating under this criterion will be based on the following formula: SR = (SRmin / SRo) × 3 The maximum number of points to be achieved in this criterion is 3.00. The Contracting Authority shall adopt the time specified in the procurement documents and the Contractor shall be awarded 0 point in this criterion.
- Time to resolve a Failure under the Maintenance Service (SU)
Timeout for the Maintenance Service (SU) The point assessment in the ‘Time to resolve the failure under Maintenance Service’ (SU) criterion will be made on the basis of the maximum Time to resolve the failure declared by the Contractor in the Offer Form*. According to the SDO, the maximum Time to resolve the crash is 8 hours after the notification. The contractor may offer a shorter Time to resolve the crash, with the shortest time taken into account for scoring being 4 working hours. The points will be calculated according to the formula: SU = (SUmin / SUo) × 3 The maximum number of points to be achieved in this criterion is 3.00. The Contracting Authority shall adopt the time specified in the procurement documents and the Contractor shall be awarded 0 point in this criterion.
- Quality
Time to remove critical susceptibility (SB) The point assessment in the ‘Time to remove critical susceptibility’ (SB) criterion will be made on the basis of the maximum time declared by the Contractor in the Offer Form to remove critical susceptibility*, i.e. having a CVSS 9.0 or higher rating. According to the IP, the maximum date for the removal of critical susceptibility is 48 hours. The contractor may offer shorter time, with the shortest time taken into account for scoring being 12 hours. The points will be calculated according to the formula: SB = (SBmin / SBo) × 4 The maximum number of points to be achieved in this criterion is 4.00. The Contracting Authority shall adopt the time specified in the procurement documents and the Contractor shall be awarded 0 point in this criterion.
The notice does not publish weights — see the tender documents.
Buyer
Centrum e-Zdrowia
- Address
- 00-184 Warszawa, Poland
- Region (NUTS)
- PL911
- Website
- cez.gov.pl
- Official contact address
- [email protected]
- The functional mailbox published in the notice. We never publish personal data.
Register identifiers
- NIP (tax id)
- 5251575309
- REGON
- 001377706
- EU VAT
- PL5251575309
What this buyer bought before
223 IT contract award notices 2020–2026, €708.1m in total.
Dostawa licencji do systemu kont uprzywilejowanych PAM
Winner: INTEGRITY PARTNERS SP. z o.o. · 1 bid
PLN 7.1m
13 Oct 2026
Zakup licencji oprogramowania zapewniającego ochronę maszyn wirtualnych w środowisku Zamawiającego
Winner: IT Solution Factor Sp. z o.o. · 1 bid
PLN 9.7m
9 Oct 2026
Dostawa Access Point WiFi, kontrolerów sieci bezprzewodowej wraz z oprogramowaniem, usługą zaprojektowania i wdrożeniem rozwiązania w infrastrukturze Centrum e…
Winner: Apex.IT Sp. z o. o. · 1 bid
PLN 452,036
7 Oct 2026
Świadczenie usług wsparcia oraz usług rozwoju Systemu Zarządzania Ryzykiem.
Winner: Blue Energy Sp. z o.o. · 2 bids
PLN 162,600
30 Sept 2026
Zakup monitorów dla Centrum e-Zdrowia
Winner: ALTBIT Sp. z o.o. · 11 bids
PLN 217,886
25 Sept 2026
Świadczenie usług z zakresu wsparcia informatycznego Centrum e-Zdrowia - Obszar 1 – Rozwój Aplikacji/Development
Winner: Transition Technologies PSC Poland Sp. z o.o. · 1 bid
PLN 641,088
24 Aug 2026
How to submit an offer
Offers are submitted only on the buyer's platform, before the deadline for offers.
- ezamowienia.gov.pl
- Platform
- yes
- Electronic submission
- no
- Electronic auction
Questions & answers
What is the deadline for offers in "Provision of development and maintenance services for the Investment Project Management Platform"?
Offers are due by 30 Nov 2026, 10:00 CET.
What is the estimated value?
The estimated value published in the notice is PLN 12.6m.
Who is the buyer?
Centrum e-Zdrowia (Warszawa, Poland); NIP (tax id) 5251575309, REGON 001377706.
Where and how do I submit an offer?
Offers are submitted electronically on ezamowienia.gov.pl.
How are offers scored?
price, Time to restore System operation in the event of a P1 Failure related to a production change (SR), Time to resolve a Failure under the Maintenance Service (SU), quality.
Which procedure is used?
Open procedure.
Win it with SalesDots
Read the documents for you
SalesDots fetches the tender documents (or takes your upload when a platform does not allow it) and answers the two questions that matter first: what the buyer wants built, and what you must prove to take part, each with the exact quote and page.
Analyse documentsMatch it with your profile
Every certificate, reference and role is checked against your company: green when you have it, amber when it expires before the deadline, grey when it needs a look.
Check my fitPrepare your response
Turn the conditions into a bid checklist with owners and due dates, draft the questions to the buyer and keep the team on one plan.
Start a responseNever miss a change
Track the deadline, amendments and answers to clarification questions, and get similar tenders and re-tenders before they are published.
Track this tenderSource: Tenders Electronic Daily (TED), Official Journal of the EU. SalesDots is not the contracting authority; offers are submitted only through the buyer's platform. Data from the official notice, refreshed 21 Nov 2026, 17:27 CET.