Purchase and supply of interactive monitors for the needs of the University of Opole
At a glance
Uniwersytet Opolski (Opole, Poland) is tendering: Purchase and supply of interactive monitors for the needs of the University of Opole. Offers are due 20 Oct 2026, 10:00 CEST. 2 lots.
- 20 Oct 2026, 10:00 CEST
- Deadline
- Open procedure
- Procedure
- Computer equipment and supplies (30200000)
- Main CPV
- 21 Sept 2026
- Published
Translated from the official notice. The original text is the legally binding one.
What the buyer wants
1. The subject of the order is: Purchase and delivery of an interactive monitor 75" to the teaching room of the Faculty of Philology – 1 pc. 2. The description of the order is set out in Annex 1.1 to the WWZ. 3. The subject of the contract will be delivered to the Contractor at the risk of the Contractor and within the remuneration (as defined in the offer) of the Contractor. 4. The Contractor shall, in the context of the proper performance of the subject-matter of the contract, deliver and submit a complete and assembled (on-the-spot installation) the subject-matter of the contract (with the parameters specified in the description of the subject-matter of the contract) to the premises indicated by the Contracting Authority within the time limit specified in point 4 of the SWZ. Where additional materials, components and equipment are required for the subject of the contract delivered The contractor shall be obliged to provide them with the remuneration specified in the tender. 5. The Contractor must offer the performance of the subject of the contract in accordance with the requirements of the Contracting Authority as defined in the SWZ and the annexes and cover the entire scope of the contract. 6. The subject matter of the contract must meet all the requirements of a safe product in accordance with Regulation (EU) No 2023/98 of the European Parliament and of the Council of 10 May 2023 on general product safety, amending Regulation (EU) No 1025/2012 of the European Parliament and of the Council and Directive (EU) 2020/1828 of the European Parliament and of the Council and repealing Directive 2001/95/EC of the European Parliament and of the Council and Council Directive 87/357/EEC of 10 May 2023 (OJ L 135, p. 1). The contractor is obliged to deliver a new item (in particular unrepaired, unrefrigerated, unexposed, previously unused, in original, unopened packaging, if applicable) from current production and legal distribution channel, efficient, complete (in particular with all components, parts, materials) and compatible with the OGA, respectively. 7. In cases where trademarks, patents, origin, source or specific process characterising certain products or services would be indicated in the description of the subject of the contract, this means that the Contracting Authority cannot describe the subject of the contract in a sufficiently precise and understandable manner and this is justified by the specificity of the object of the contract. In such situations, the possible use of the above indications shall be read ‘or equivalent’. The Contracting Authority shall indicate in the description of the subject matter of the contract the criteria used to assess equivalence.
I. Przedmiot zamówienia: 1. Przedmiotem zamówienia jest: Zakup i dostawa monitorów interaktywnych na potrzeby Uniwersytetu Opolskiego, w podziale na części: 1.1. Część nr 1 – Zakup i dostawa monitora interaktywnego 75” do sali dydaktycznej Wydziału Filologicznego – 1 szt. 1.2. Część nr 2 – Zakup i dostawa monitora interaktywnego 75” do sali 201 Wydziału Filologicznego - 1 szt. 2. Opis przedmiotu zamówienia: 2.1. w odniesieniu do części nr 1 stanowi załącznik nr 1.1 do SWZ, 2.2. w odniesieniu do części nr 2 stanowi załącznik nr 1.2 do SWZ. II. Pozostałe informacje: 1. Zamawiający dopuszcza możliwość składania ofert częściowych. 2. Zamawiający nie dopuszcza składania ofert wariantowych. 3. Zamawiający nie wymaga zatrudnienia na podstawie stosunku pracy, w okolicznościach, o których mowa w art. 95 ustawy. 4. Zamawiający nie przewiduje możliwości udzielenia zamówień, o których mowa w art. 214 ust. 1 pkt 7 i 8 ustawy Pzp. 5. Zamawiający nie wymaga wniesienia wadium. 6. Zamawiający nie wymaga wniesienia zabezpieczenia należytego wykonania umowy.
Lots (2)
Lot 1Zakup i dostawa monitora interaktywnego 75” do sali dydaktycznej Wydziału Filologicznego – 1 szt.
1. The subject of the order is: Purchase and delivery of an interactive monitor 75" to the teaching room of the Faculty of Philology – 1 pc. 2. The description of the order is set out in Annex 1.1 to the WWZ. 3. The subject of the contract will be delivered to the Contractor at the risk of the Contractor and within the remuneration (as defined in the offer) of the Contractor. 4. The Contractor shall, in the context of the proper performance of the subject-matter of the contract, deliver and submit a complete and assembled (on-the-spot installation) the subject-matter of the contract (with the parameters specified in the description of the subject-matter of the contract) to the premises indicated by the Contracting Authority within the time limit specified in point 4 of the SWZ. Where additional materials, components and equipment are required for the subject of the contract delivered The contractor shall be obliged to provide them with the remuneration specified in the tender. 5. The Contractor must offer the performance of the subject of the contract in accordance with the requirements of the Contracting Authority as defined in the SWZ and the annexes and cover the entire scope of the contract. 6. The subject matter of the contract must meet all the requirements of a safe product in accordance with Regulation (EU) No 2023/98 of the European Parliament and of the Council of 10 May 2023 on general product safety, amending Regulation (EU) No 1025/2012 of the European Parliament and of the Council and Directive (EU) 2020/1828 of the European Parliament and of the Council and repealing Directive 2001/95/EC of the European Parliament and of the Council and Council Directive 87/357/EEC of 10 May 2023 (OJ L 135, p. 1). The contractor is obliged to deliver a new item (in particular unrepaired, unrefrigerated, unexposed, previously unused, in original, unopened packaging, if applicable) from current production and legal distribution channel, efficient, complete (in particular with all components, parts, materials) and compatible with the OGA, respectively. 7. In cases where trademarks, patents, origin, source or specific process characterising certain products or services would be indicated in the description of the subject of the contract, this means that the Contracting Authority cannot describe the subject of the contract in a sufficiently precise and understandable manner and this is justified by the specificity of the object of the contract. In such situations, the possible use of the above indications shall be read ‘or equivalent’. The Contracting Authority shall indicate in the description of the subject matter of the contract the criteria used to assess equivalence.
Lot 2Zakup i dostawa monitora interaktywnego 75” do sali 201 Wydziału Filologicznego - 1 szt.
1. Przedmiotem zamówienia jest: Zakup i dostawa monitora interaktywnego 75” do sali 201 Wydziału Filologicznego - 1 szt. 2. Opis przedmiotu zamówienia stanowi załącznik nr 1.2 do SWZ. 3. Przedmiot zamówienia dostarczony będzie Zamawiającemu na ryzyko Wykonawcy i w ramach wynagrodzenia (określonego w ofercie) przysługującego Wykonawcy. 4. Wykonawca w ramach należytego wykonania przedmiotu zamówienia zobowiązany jest do dostarczenia oraz wniesienia kompletnego i zmontowanego (dopuszcza się montaż na miejscu) przedmiotu zamówienia (o parametrach określonych w opisie przedmiotu zamówienia) do wskazanego przez Zamawiającego pomieszczenia, w terminie określonym w pkt. 4 SWZ. Jeżeli dla dostarczonego przedmiotu zamówienia wymagane jest zapewnienie dodatkowych materiałów, elementów i sprzętu Wykonawca zobowiązany jest do ich zapewnienia w ramach wynagrodzenia określonego w ofercie. 5. Wykonawca musi zaoferować realizację przedmiotu zamówienia zgodnie z wymogami Zamawiającego określonymi w SWZ oraz załącznikach i objąć ofertą cały zakres przedmiotu zamówienia. 6. Przedmiot zamówienia musi spełniać wszystkie wymagania produktu bezpiecznego zgodnie z Rozporządzeniem Parlamentu Europejskiego i Rady (UE) 2023/988 z dnia 10 maja 2023 r. w sprawie ogólnego bezpieczeństwa produktów, zmieniające rozporządzenie Parlamentu Europejskiego i Rady (UE) nr 1025/2012 i dyrektywę Parlamentu Europejskiego i Rady (UE) 2020/1828 oraz uchylające dyrektywę 2001/95/WE Parlamentu Europejskiego i Rady i dyrektywę Rady 87/357/EWG z dnia 10 maja 2023 r. (Dz.Urz.UE.L Nr 135, str. 1). Wykonawca zobowiązany jest do dostarczenia fabrycznie nowego przedmiotu zamówienia (w szczególności nienaprawiany, nierefabrykowany, niepowystawowy, wcześniej nieużywany, w oryginalnym, nieotwieranym opakowaniu – jeśli dotyczy) pochodzącego z bieżącej produkcji oraz legalnego kanału dystrybucji, sprawnego, kompletnego (w szczególności ze wszystkimi podzespołami, częściami, materiałami) oraz zgodnego z OPZ – odpowiednio do części. 7. W przypadkach, kiedy w opisie przedmiotu zamówienia wskazane zostałyby znaki towarowe, patenty, pochodzenie, źródło lub szczególny proces, charakteryzujące określone produkty lub usługi, oznacza to, że Zamawiający nie może opisać przedmiotu zamówienia w wystarczająco precyzyjny i zrozumiały sposób i jest to uzasadnione specyfiką przedmiotu zamówienia. W takich sytuacjach ewentualne posłużenie się powyższymi wskazaniami, należy odczytywać z wyrazami „lub równoważny”. Zamawiający wskazuje w opisie przedmiotu zamówienia kryteria stosowane w celu oceny równoważności.
Can you bid? Your readiness check
These are the conditions this notice asks bidders to prove. In SalesDots each one is checked against your company profile: certificates with their validity dates, delivered references and your people.
This notice does not spell out the conditions to take part; they are in the tender documents. SalesDots fetches the documents where the platform allows it (or takes your upload), reads them for you and turns them into this checklist.
Detected automatically in the published notice. Always confirm against the tender documents.
Check it against my companyHow offers are scored
- The basis for the evaluation by the Contracting Authority in the criterion for the evaluation of the offer ‘Price’ b..60%
- The criterion for the evaluation of tenders "Term of performance of the subject matter of the contract". After..10%
- The criterion for the evaluation of tenders: "Guarantee term for the subject of the order". P..30%
What this buyer bought before
Recent IT contracts awarded by the same buyer, from published award notices.
D/74/2026/ZWR Rozwój bazy wiedzy UO wykorzystującej oprogramowanie Omega-PSIR w zakresie konfiguracji integracji umożliwiającej dostęp do JSR API wraz z dostar…
Winner: Sages sp. z o.o. · 1 bid
PLN 30,135
23 Sept 2026
Zakup i dostawa sprzętu komputerowego dla różnych jednostek Uniwersytetu Opolskiego
Winner: PWH WIP – Małgorzata Szczepanik-Grzywocz · 9 bids
PLN 621,435
31 Aug 2026
D/72/2026/ZWR Kontynuacja dostępu do platformy IBUK Libra z kolekcją elektronicznych wersji polskich publikacji książkowych
Winner: Wydawnictwo Naukowe PWN Spółka Akcyjna · 1 bid
PLN 199,894
14 Aug 2026
D/36/2026/A Zakup i dostawa sprzętu komputerowego na potrzeby Uniwersytetu Opolskiego
Winner: Spinel Sp. z o.o. · 2 bids
PLN 26,530
5 Aug 2026
D/34/2026 Zakup licencji oraz wsparcia oprogramowania do zarządzania dostępem do licencjonowanych naukowych baz danych
Winner: Sages sp. z o. o. · 1 bid
PLN 37,515
31 Jul 2026
D/66/2026 Zakup i dostawa przełączników do sieci LAN.
Winner: INFUS Katarzyna Fuśnik · 2 bids
PLN 31,500
29 Jul 2026
Win it with SalesDots
Read the documents for you
SalesDots fetches the tender documents (or takes your upload when a platform does not allow it) and answers the two questions that matter first: what the buyer wants built, and what you must prove to take part, each with the exact quote and page.
Analyse documentsMatch it with your profile
Every certificate, reference and role is checked against your company: green when you have it, amber when it expires before the deadline, grey when it needs a look.
Check my fitPrepare your response
Turn the conditions into a bid checklist with owners and due dates, draft the questions to the buyer and keep the team on one plan.
Start a responseNever miss a change
Track the deadline, amendments and answers to clarification questions, and get similar tenders and re-tenders before they are published.
Track this tenderSource: Tenders Electronic Daily (TED), Official Journal of the EU. SalesDots is not the contracting authority; offers are submitted only through the buyer's platform.