Upgrade of the ICAO PKI PASSPORTS system
At a glance
COMPANIA NATIONALA "IMPRIMERIA NATIONALA" S.A. (Bucuresti, Romania) is tendering: Upgrade of the ICAO PKI PASSPORTS system. Offers are due 11 Jan 2027, 14:00 CET. Estimated value RON 2.2m, 4-month contract, 2 lots. Bidders must show, among other things: certificates.
Already a customer? Open it in the app
Translated from the official notice. The original text is the legally binding one.
Free · no account
Get tenders like this one by e-mail
Key facts
- Deadline
- RON 2.2m
- Estimated value
- 4 months
- Duration
- Open procedure
- Procedure
- 13 Nov 2026
- Published
- 790495-2026
- Notice number
- 30003
- Reference number
- Software package and information systems (48000000)
- Main CPV
- RO321
- Place of performance (NUTS)
- 2
- Lots
- not allowed
- Variant offers
- Romanian
- Language of offers
Dates
Every date of the notice and its changes, in order. Times: Brussels / Warsaw.
Notice published
Opening of offers
Deadline for offers
What the buyer wants
The contract covers the acquisition of UPGRADE SYSTEM PKI ICAO PASSAPOART. Technical characteristics can be found in the specifications for the procurement procedure. The ICAO PKI system is the cryptographic infrastructure essential for issuing and validating electronic passports, ensuring the digital signature, certification and verification mechanisms required under ICAO international standards. This system underpins the security of Romanian travel documents and ensures their interoperability with border control infrastructures in EU Member States and other international jurisdictions.
CPV codes
- 48000000Software package and information systemsmain
Lots (2)
The contract is divided into 2 lots. Offers may be submitted for selected lots where the documents allow it.
Lot 1Default lot
- Estimated value:
- RON 2.2m
- Duration:
- 4 months
- Place (NUTS):
- RO321
- CPV:
- 48000000 · Software package and information systems
The contract covers the acquisition of UPGRADE SYSTEM PKI ICAO PASSAPOART. Technical characteristics can be found in the specifications for the procurement procedure. The ICAO PKI system is the cryptographic infrastructure essential for issuing and validating electronic passports, ensuring the digital signature, certification and verification mechanisms required under ICAO international standards. This system underpins the security of Romanian travel documents and ensures their interoperability with border control infrastructures in EU Member States and other international jurisdictions.
Lot 2
- Estimated value:
- RON 2.2m
- Duration:
- 4 months
Conditions for participation & required documents
What the notice asks bidders to prove, and the documents it requires. Full text below.
Conditions in the notice
- CertificatesCompany or personnel certificates named in the notice
Detected automatically in the published notice. Always confirm against the tender documents.
Show the notice text (2)
Economic operators (tenderer, associate tenderer) submitting the tender must prove a form of registration under the law of the resident country showing that the economic operator is legally constituted, that he is not in any of the situations of annulment of the constitution, and that he has the professional capacity to carry out the activities covered by the public / sectoral contract.
The requirement shall also apply to subcontractors who supplement information related to their situation at the level of a distinct DUAE. Method of implementation: The economic operators participating in the award procedure shall complete the DUAE, in accordance with Article 193 (1) of Law No 98 / 2016 on public procurement, with the information requested by the contracting authority / entity relating to their situation.
The supporting documents proving the information contained in the DUAE, namely the finding certificate issued by ONRC, or in the case of foreign legal / natural bidders, the equivalent documents issued in the country of residence, translated into Romanian, are to be submitted, at the request of the contracting authority, only by the highest bidder after the ranking has been drawn up. The supporting documents must be valid on the date of their submission.
Where parts of the contract will be executed by subcontractors, proof of registration and correspondence of the principal / secondary activities within the contract with the subject-matter of the procurement will also be submitted by subcontractors for the part of the contract they will perform.
For foreign legal / natural persons, any edifying documents, equivalent to the required documents, issued by the competent authorities of the country where they are residents, in accordance with the legislation of the country of residence, shall be presented in a legible, signed and stamped copy, with the indication according to the original and authorised translation.
- A list of the main supplies of products, such as those covered by the purchase / similar over the last 3 years, calculated up to the closing date for the submission of tenders comprising one or more service contracts, demonstrating the delivery of products of a cumulative value / value of at least 2.200.000,00 lei, excluding T.V.A. (representing the estimated value of the purchase), at the level of one or more contracts.Similar products include the delivery and installation of hardware infrastructure equipment (servers and / or data storage systems and / or network / security equipment) designed to support critical IT systems, built in an integrated manner with related deployment services.Method of implementation: The economic operators participating in the award procedure shall complete the DUAE, in accordance with Article 193 (1) of Law No 98 / 2016 on public procurement, with the information requested by the contracting authority / entity relating to their situation. The nominated associate (s) shall present separately the DUAE containing the requested information.Information such as: the number and date of the contract invoked as a similar experience, the type (s) of service, the value, the beneficiary, the date and number of the receipt document shall be specified at the level of the DUAE. The following supporting documents proving the fulfilment of the requirement shall be submitted only by the highest bidder in the intermediate ranking drawn up on completion of the evaluation of tenders:
- documents showing the following information: beneficiary, period and place of supply;
- recommendations;
- other equivalent documents. The contracting authority shall have the right to address including the final beneficiary of the goods supplied which are the subject of the contract submitted as similar experience in order to confirm those submitted by the tenderer.
- Proof that it has experience in providing data and certificate migration services, commissioning and post-implementation technical support for a public key infrastructure based on ENTRUST technology. Method of implementation: DUAE will be supplemented by economic operators participating in the procurement procedure with the information requested by the contracting authority
- participating economic operators will submit recommendations from the beneficiaries in this requirement. The recommendation / recommendations suggesting the fulfilment of those undertaken by the completion of the DUAE will / will be submitted, at the request of the contracting authority, only by the tenderer ranked 1st in the intermediate ranking drawn up on completion of the evaluation of tenders.
This is how SalesDots checks this tender: the notice's conditions, this contract's own facts, the requirements typical for its category and your company's registers. The statuses below are an example; you see the real result after signing in.
5 met · 0 expiring · 1 missing · 5 to check
Conditions in this notice
- Certificates named in the noticematched against the certificates in your profileNeeds a look
This tender's facts
- 2 lotschoose the lots you can deliver and price each oneNeeds a look
- Price — 40% of the scoreyour price against past winning bidsNeeds a look
- Degree of environmental compliance of the hardware equipment (P3) — 20% of the scoreevidence ready for this award criterionNeeds a look
- Delivery, installation and commissioning period (P2) — 20% of the scoreevidence ready for this award criterionIn your profile
- Who wins at this buyerrecently: S & T ROMANIA, Advice Information Technology — 3 different winners in the last 6 awardsNeeds a look
Typical for: System implementation
- Implementation partner statuscertified for the platform being implementedIn your profile
- Comparable implementationsreferences of similar scope and valueIn your profile
- Implementation teamproject manager and certified consultantsNot in your profile yet
- Data migration and integrationsexperience with the buyer's current systemsIn your profile
- Training and documentationuser and administrator training in the buyer's languageIn your profile
Registers — checked automatically
- National company registercompany active, representation matchesVerified
- EU VAT (VIES)number active in VIESVerified
- LEI (GLEIF)LEI issued and renewed, data matches the registerVerified
- Sanctions screeningcompany and owners not listedVerified
Free · no account
Get tenders like this one by e-mail
Free check · 10 seconds
Does your company fit this tender?
Award criteria
The full criteria and their weights, as published in the notice.
For all lots
- The price of the offer40%
Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat.
- Delivery, installation and commissioning period (P2)20%
Formula care se va utiliza pentru determinarea punctajului P2 pentru termen de livrare, instalare si punere in functiune este P2(n) = TMAX- T(n) / TMAX-TMIN x 20 Unde: T(n) – Termen de livrare, instalare și punere în funcțiune ofertat de ofertantul (n) exprimat în zile (calendaristice) TMIN – Termenul de livrare, instalare și punere în funcțiune de 60 de zile sub care oferta nu va fi punctată suplimentar. TMAX – Termenul de livrare, instalare și punere în funcțiune de maxim 90 de zile definit în caietul de sarcini, peste care oferta este neconformă. P2(n) – Punctajul obținut de ofertant (n) pentru Termen de livrare, instalare si punere in functiune (n) exprimat în zile (calendaristice).
- Degree of environmental compliance of the hardware equipment (P3)20%
Formula care se va utiliza pentru determinarea punctajului P3 pentru gradul de conformitate ecologică a echipamentelor hardware este P3(n) = Numărul de categorii de echipamente certificate ENERGY STAR din ofertă / Numărul total de categorii de echipamante solicitate (8)* x 20 * Cele 8 categorii hardware fizice supuse evaluării sunt: 1. Server Cluster Producție (Servere Enterprise) 2. Server Cluster DMZ (Servere Enterprise) 3. Server Domain Controller (Servere Enterprise) 4. Storage DMZ (Echipamente de stocare date) 5. Storage Productie (Echipamente de stocare date) 6. Fiber Channel Switch (Echipamente de rețea) 7. Network Switch 25Gbe (Echipamente de rețea) 8. Firewall (Hardware de securitate/rețea) Barele PDU (K), soluția de backup (I), licențele Dell PowerProtect (L) și dispozitivul de sincronizare a timpului (J) sunt excluse din numărătoarea de bază deoarece prin această abordare, Autoritatea Contractantă maximizează impactul ecologic impus de H.G. nr. 427/2025, concentrând evaluarea de mediu strict asupra marilor consumatori de energie din centrul de date (sistemele de calcul, stocare și rețea principală). Astfel, se asigură o evaluare transparentă, pur matematică și un mediu concurențial optim pentru toți producătorii majori de echipamente IT.
- Extended warranty (P4)20%
Formula care se va utiliza pentru determinarea punctajului P4 Garanția extinsă este P4(n) = G(n)- GMIN / GMAX- GMIN x 20 Unde: P4(n) – Punctajul obținut de ofertant (n) pentru Garanție. G(n) – Perioada de garanție din ofertă (exprimata în număr de luni) GMAX – Perioada de garanție maximă ofertată posibilă de 60 de luni. GMIN – Perioada de garanție minimă cerută prin caietul de sarcini de 36 de luni Oferta care va prezenta perioada minimă de garanție mai mică decât 36 de luni va fi considerată neconformă. Pentru perioada de garanție minimă de 36 de luni oferta este conformă și punctajul acordat este 0 (zero). Pentru o perioadă de garanție mai mare sau egală cu 60 de luni, oferta se va puncta cu 20 puncte.
Buyer
COMPANIA NATIONALA "IMPRIMERIA NATIONALA" S.A.
- Address
- Strada: Maniu Iuliu, nr. 244D, 061126 Bucuresti, Romania
- Region (NUTS)
- RO321
- Website
- www.cnin.ro
Register identifiers
- LEI
- 98450094C8L0E96JD137
- Registration no. in the notice
- 2779625
What this buyer bought before
14 IT contract award notices 2020–2026, €19.7m in total.
ACHIZIŢIA UNUI SISTEM PRELUARE/CULEGERE DATE SI ELIBERARE DOCUMENTE
Winner: S & T ROMANIA · 4 bids
RON 19.6m
23 Dec 2025
48 bucăți STAȚII DE LUCRU SISTEM PAȘAPOARTE TEMPORARE
Winner: Advice Information Technology
RON 273,936
13 Sept 2024
Complete preluare si eliberare documente IGI
Winner: Advice Information Technology
RON 324,125
29 Aug 2024
ACHIZIŢIA UNUI SISTEM PKI - AUTORITATE DE CERTIFICARE CARTEA DE IDENTITATE
Winner: Advice Information Technology · 5 bids
RON 14.9m
20 Aug 2024
Modernizare sistem management electronic al documentelor
Winner: Advice Information Technology
RON 497,000
13 Aug 2024
ACHIZIȚIE DE SERVICII PLATFORMĂ „EMITENT DE ID
Winner: MAGUAY COMPUTERS +1 more contractors · 1 bid
RON 32.9m
5 Aug 2024
How to submit an offer
Offers are submitted only on the buyer's platform, before the deadline for offers.
- www.e-licitatie.ro
- Platform
- yes
- Electronic submission
- no
- Electronic auction
Questions & answers
What is the deadline for offers in "Upgrade of the ICAO PKI PASSPORTS system"?
Offers are due by 11 Jan 2027, 14:00 CET.
What is the estimated value?
The estimated value published in the notice is RON 2.2m.
Who is the buyer?
COMPANIA NATIONALA "IMPRIMERIA NATIONALA" S.A. (Bucuresti, Romania); LEI 98450094C8L0E96JD137.
Where and how do I submit an offer?
Offers are submitted electronically on www.e-licitatie.ro.
Is the contract divided into lots?
Yes, into 2 lots.
How are offers scored?
The price of the offer 40%, Delivery, installation and commissioning period (P2) 20%, Degree of environmental compliance of the hardware equipment (P3) 20%, Extended warranty (P4) 20%.
Which procedure is used?
Open procedure.
Win it with SalesDots
Read the documents for you
SalesDots fetches the tender documents (or takes your upload when a platform does not allow it) and answers the two questions that matter first: what the buyer wants built, and what you must prove to take part, each with the exact quote and page.
Analyse documentsMatch it with your profile
Every certificate, reference and role is checked against your company: green when you have it, amber when it expires before the deadline, grey when it needs a look.
Check my fitPrepare your response
Turn the conditions into a bid checklist with owners and due dates, draft the questions to the buyer and keep the team on one plan.
Start a responseNever miss a change
Track the deadline, amendments and answers to clarification questions, and get similar tenders and re-tenders before they are published.
Track this tenderSource: Tenders Electronic Daily (TED), Official Journal of the EU. SalesDots is not the contracting authority; offers are submitted only through the buyer's platform. Data from the official notice, refreshed 21 Nov 2026, 16:48 CET.