11 days leftSystem implementationEU-fundedPolski

Purchase and implementation of server infrastructure supporting the implementation of e-services for the Municipal Municipal Municipal Plant Sp. z o.o. based in Stalowa Wola with division into parts and with the right of option.

Miejski Zakład Komunalny Sp. z o.o.Stalowa Wola, PolandNotice 477499-2026

At a glance

Miejski Zakład Komunalny Sp. z o.o. (Stalowa Wola, Poland) is tendering: Purchase and implementation of server infrastructure supporting the implementation of e-services for the Municipal Municipal Municipal Plant Sp. z o.o. based in Stalowa Wola with division into parts and with the right of option.. Offers are due 15 Oct 2026, 10:00 CEST. Estimated value PLN 670,080, 3 lots. Bidders must show, among other things: references, bid deposit.

15 Oct 2026, 10:00 CEST
Deadline
PLN 670,080
Estimated value
Open procedure
Procedure
Computer servers (48822000)
Main CPV
10 Jul 2026
Published

Translated from the official notice. The original text is the legally binding one.

What the buyer wants

1. The subject of the order for Part 1 includes: 1) performance of the basic order including the purchase and delivery of IT equipment - servers and licenses under the ERP system with implementation. The minimum requirements and quantities for infrastructure and licences are described in Annex 2A to the SWZ - Description of the Order Part 1.2. the execution of an optional contract covering the purchase and delivery of a maximum capacity of 256 GB RDIMM DDR5 6400 MT/s in modules with a capacity of 64GB. 2. Contractors under this contract provide for the use of options under the terms set out in the EGM, including Annex 2A to the EGM — Description of the subject matter of the contract for Part 1 and Annex 3A to the EGM — Designed provisions of the contract for Part 1. 3. Term of completion of the order for Part 1: up to 180 days from the date of conclusion of the contract, except that the delivery of equipment and software should be carried out within 160 days from the date of conclusion of the contract. Implementation should start up to 7 days from the date of delivery of the last component necessary for installation and configuration of equipment and licences. 4. The term of implementation of the subject matter of the Agreement referred to in point 3 shall include the completion of all deliveries of the assortment listed in the POZ and the Contractor's offer and its installation and configuration with the provision of post-implementation documentation.

1. Przedmiotem zamówienia jest zakup i wdrożenie infrastruktury serwerowej wspierającej realizację e-usług dla Miejskiego Zakładu Komunalnego Sp. z o.o. z siedzibą w Stalowej Woli z podziałem na części i z prawem opcji. 2. Zadanie realizowane jest w ramach projektu pn. „Wprowadzenie nowych e-usług dla klientów MZK Sp. z o.o. w Stalowej Woli”, współfinansowanego z Europejskiego Funduszu Rozwoju Regionalnego w ramach Priorytetu nr FEPK.01 „Konkurencyjna i Cyfrowa Gospodarka”, Działanie FEPK.01.02 Cyfryzacja, programu regionalnego Fundusze Europejskie dla Podkarpacia 2021-2027, Numer naboru FEPK.01.02-IZ.00-001/23. 3. Zamawiający dokonuje podziału zamówienia na części. Części określone są jako: 1) Część 1 - Zakup i dostawa serwerów oraz licencji pod system ERP z opcją, 2) Część 2 - Zakup i dostawa sprzętu pod systemy IT z opcją, 3) Część 3 - Zakup i dostawa serwerów pod system Cyberbezpieczeństwa z opcją. 4. Szczegółowy opis przedmiotu zamówienia (OPZ) znajduje się w: 1) Załączniku nr 2A do SWZ – Opis Przedmiotu Zamówienia dla Części 1 oraz Załączniku nr 3A do SWZ – Projektowane postanowienia umowy dla Części 1, 2) Załączniku nr 2B do SWZ – Opis Przedmiotu Zamówienia dla Części 2 oraz Załączniku nr 3B do SWZ – Projektowane postanowienia umowy dla Części 2, 3) Załączniku nr 2C do SWZ – Opis Przedmiotu Zamówienia dla Części 3 oraz Załączniku nr 3C do SWZ – Projektowane postanowienia umowy dla Części 3. 5. Termin realizacji zamówienia: do 180 dni od dnia zawarcia umowy (dla wszystkich części). 6. Zamawiający nie wprowadza ograniczenia w ilości części, na które zamówienie może być udzielone temu samemu Wykonawcy- każdy z Wykonawców ma prawo złożyć ofertę na jedną lub wszystkie części zamówienia. Wykonawca może złożyć tylko jedną ofertę na daną część. Każda część przedmiotu zamówienia oceniana będzie odrębnie.

Lots (3)

  1. Lot 11. Przedmiot zamówienia dla Części 1 obejmuje: 1) wykonanie zamówienia podstawowego obejmu

    PLN 670,080

    1. The subject of the order for Part 1 includes: 1) performance of the basic order including the purchase and delivery of IT equipment - servers and licenses under the ERP system with implementation. The minimum requirements and quantities for infrastructure and licences are described in Annex 2A to the SWZ - Description of the Order Part 1.2. the execution of an optional contract covering the purchase and delivery of a maximum capacity of 256 GB RDIMM DDR5 6400 MT/s in modules with a capacity of 64GB. 2. Contractors under this contract provide for the use of options under the terms set out in the EGM, including Annex 2A to the EGM — Description of the subject matter of the contract for Part 1 and Annex 3A to the EGM — Designed provisions of the contract for Part 1. 3. Term of completion of the order for Part 1: up to 180 days from the date of conclusion of the contract, except that the delivery of equipment and software should be carried out within 160 days from the date of conclusion of the contract. Implementation should start up to 7 days from the date of delivery of the last component necessary for installation and configuration of equipment and licences. 4. The term of implementation of the subject matter of the Agreement referred to in point 3 shall include the completion of all deliveries of the assortment listed in the POZ and the Contractor's offer and its installation and configuration with the provision of post-implementation documentation.

  2. Lot 2Zakup i dostawa serwerów oraz licencji pod system ERP z opcją

    €2.3m

    1. Przedmiot zamówienia dla Części 2 obejmuje: 1) wykonanie zamówienia podstawowego obejmującego zakup i dostawę sprzętu pod systemy IT- serwery, serwer kopii zapasowej, urządzenie dyskowe kopii zapasowych (deduplikator), biblioteka taśmowa, oprogramowanie do tworzenia kopii – 30 VM, macierz, przełączniki 25G, przełączniki do zarządzania wraz z wdrożeniem. Minimalne wymagania oraz ilości dotyczące infrastruktury oraz licencji opisane zostały w Załączniku nr 2B do SWZ - Opis przedmiotu Zamówienia Część 2. 2) wykonanie zamówienia opcjonalnego obejmującego zakup i dostawę pamięci RAM w maksymalnej wielkości 256 GB RDIMM DDR5 6400 MT/s w modułach o pojemności 64GB. 2. Zamawiający w ramach niniejszego zamówienia przewiduje zastosowanie opcji na zasadach określonych w SWZ, w tym Załączniku nr 2B do SWZ – Opis Przedmiotu Zamówienia dla Części 2 oraz Załączniku nr 3B do SWZ – Projektowane postanowienia umowy dla Części 2. 3. Termin realizacji zamówienia dla Części 2: do 180 dni od dnia zawarcia umowy, z tym, że dostawa sprzętu i oprogramowania winna zostać wykonana w terminie 160 dni od dnia zawarcia umowy. Wdrożenie należy rozpocząć do 7 dni od daty dostarczenia ostatniego komponentu niezbędnego do instalacji oraz konfiguracji sprzętu i licencji. 4. Termin wykonania przedmiotu Umowy, o którym mowa w pkt 3, obejmuje zakończenie wszystkich dostaw asortymentu wymienionego w OPZ i ofercie Wykonawcy oraz jego instalację i konfigurację wraz z dostarczeniem dokumentacji powdrożeniowej.

  3. Lot 31. Przedmiot zamówienia dla Części 3 obejmuje: 1) wykonanie zamówienia podstawowego obejmu

    €773,805

    1. Przedmiot zamówienia dla Części 3 obejmuje: 1) wykonanie zamówienia podstawowego obejmującego zakup i dostawę serwerów pod system Cyberbezpieczeństwa - serwery, macierz wraz z wdrożeniem. Minimalne wymagania oraz ilości dotyczące infrastruktury opisane zostały w Załączniku nr 2C do SWZ - Opis przedmiotu Zamówienia Część 3. 2) wykonanie zamówienia opcjonalnego obejmującego zakup i dostawę pamięci RAM w maksymalnej wielkości 256 GB RDIMM DDR5 6400 MT/s w modułach o pojemności 64GB. 2. Zamawiający w ramach niniejszego zamówienia przewiduje zastosowanie opcji na zasadach określonych w SWZ, w tym Załączniku nr 2C do SWZ – Opis Przedmiotu Zamówienia dla Części 3 oraz Załączniku nr 3C do SWZ – Projektowane postanowienia umowy dla Części 3. 3. Termin realizacji zamówienia dla Części 3: do 180 dni od dnia zawarcia umowy, z tym, że dostawa sprzętu i oprogramowania winna zostać wykonana w terminie 160 dni od dnia zawarcia umowy. Wdrożenie należy rozpocząć do 7 dni od daty dostarczenia ostatniego komponentu niezbędnego do instalacji oraz konfiguracji sprzętu i licencji. 4. Termin wykonania przedmiotu Umowy, o którym mowa w pkt 3, obejmuje zakończenie wszystkich dostaw asortymentu wymienionego w OPZ i ofercie Wykonawcy oraz jego instalację i konfigurację wraz z dostarczeniem dokumentacji powdrożeniowej.

What a bidder needs

Can you bid? Your readiness check

These are the conditions this notice asks bidders to prove. In SalesDots each one is checked against your company profile: certificates with their validity dates, delivered references and your people.

Example company profile
  • References

    Similar contracts delivered before

    In your profile
  • Bid deposit

    A deposit or guarantee with the offer

    Needs a look

Detected automatically in the published notice. Always confirm against the tender documents.

Check it against my company
Show the notice text (3)

The Contracting Authority shall lay down the conditions for participation in the proceedings concerning technical or professional capacity in the area of the Contractor's experience. The Contracting Authority shall consider that the Contractor has the necessary experience to carry out the contract at the appropriate quality level, if the Contractor demonstrates that in the last 3 years counted backwards from the date on which the time limit for the submission of tenders expires, and if the period of business is shorter, during that period he has duly completed at least 1 contract for the supply of IT infrastructure or for the supply of data security systems with its implementation (installation and configuration) of: for Part 1 at least PLN 380 000,00 gross (in words: three hundred eighty thousand PLN 00/100). The purchaser explains that IT infrastructure means servers, matrices, backup systems and equipment, network switches. A single contract shall mean a service rendered on the basis of a single contract. The Contracting Authority shall not allow the summation (connection) of several orders and display them as a single order in order to fulfil the condition. Pursuant to Article 117(3) of the Public Procurement Law, the Contracting Authority shall inform that it shall consider the technical or professional capacity in terms of experience to be fulfilled if at least one of the Contractors jointly applying for the award of the contract fulfils the condition in its entirety. In the case of Contractors jointly applying for a contract, the condition of participation in the experiment procedure must be fulfilled in full by at least one of these Contractors. Where the Contractor relies on the capacity of the entity making available the resources referred to in Article 118 of the Ppp Act, the condition of participation in the experiment procedure must be fulfilled in full by that entity. Where the value of the contract is specified in a currency other than in Polish zlotys, The Ordering Party will convert this value into Polish gold - on the basis of the average rate of gold in relation to the foreign currency, as specified in the Table of National Courses of the Bank of Poland on the day of publication of the contract notice. If the date of publication of the notice is Saturday or a day off, then the currency conversion rate The Contracting Authority will accept the average rate of the National Bank of Poland on the first working day after the day of publication of the contract notice.

The Contracting Authority shall lay down the conditions for participation in the proceedings concerning technical or professional capacity in the area of the Contractor's experience. The Contracting Authority shall consider that the Contractor has the necessary experience to carry out the contract at the appropriate quality level if the Contractor demonstrates that during the last 3 years counted backwards from the date on which the time limit for the submission of tenders expires, and if the period of business is shorter, during that period he has duly completed at least 1 contract for the supply of IT infrastructure or the supply of data security systems together with its implementation (installation and configuration) with a value: for Part 2 at least PLN 1 350 000,00 (say: one million three hundred fifty thousand PLN 00/100). The purchaser explains that IT infrastructure means servers, matrices, backup systems and equipment, network switches. A single contract shall mean a service rendered on the basis of a single contract. The Contracting Authority shall not allow the summation (connection) of several orders and display them as a single order in order to fulfil the condition. Pursuant to Article 117(3) of the Public Procurement Law, the Contracting Authority shall inform that it shall consider the technical or professional capacity in terms of experience to be fulfilled if at least one of the Contractors jointly applying for the award of the contract fulfils the condition in its entirety. In the case of Contractors jointly applying for a contract, the condition of participation in the experiment procedure must be fulfilled in full by at least one of these Contractors. Where the Contractor relies on the capacity of the entity making available the resources referred to in Article 118 of the Ppp Act, the condition of participation in the experiment procedure must be fulfilled in full by that entity. Where the value of the contract is specified in a currency other than in Polish zlotys, The Ordering Party will convert this value into Polish gold - on the basis of the average rate of gold in relation to the foreign currency, as specified in the Table of National Courses of the Bank of Poland on the day of publication of the contract notice. If the date of publication of the notice is Saturday or a day off, then the currency conversion rate The Contracting Authority will accept the average rate of the National Bank of Poland on the first working day after the day of publication of the contract notice.

The Contracting Authority shall lay down the conditions for participation in the proceedings concerning technical or professional capacity in the area of the Contractor's experience. The Contracting Authority shall consider that the Contractor has the necessary experience to carry out the contract at the appropriate quality level if the Contractor demonstrates that during the last 3 years counted backwards from the date on which the time limit for the submission of tenders expires, and if the period of business is shorter, during that period he has duly completed at least 1 contract for the supply of IT infrastructure or the supply of data security systems together with its implementation (installation and configuration) with a value of: for Part 3 at least PLN 445 000,00 (in words: four hundred forty-five thousand PLN 00/100). The purchaser explains that IT infrastructure means servers, matrices, backup systems and equipment, network switches. A single contract shall mean a service rendered on the basis of a single contract. The Contracting Authority shall not allow the summation (connection) of several orders and display them as a single order in order to fulfil the condition. Pursuant to Article 117(3) of the Public Procurement Law, the Contracting Authority shall inform that it shall consider the technical or professional capacity in terms of experience to be fulfilled if at least one of the Contractors jointly applying for the award of the contract fulfils the condition in its entirety. In the case of Contractors jointly applying for a contract, the condition of participation in the experiment procedure must be fulfilled in full by at least one of these Contractors. Where the Contractor relies on the capacity of the entity making available the resources referred to in Article 118 of the Ppp Act, the condition of participation in the experiment procedure must be fulfilled in full by that entity. Where the value of the contract is specified in a currency other than in Polish zlotys, The Ordering Party will convert this value into Polish gold - on the basis of the average rate of gold in relation to the foreign currency, as specified in the Table of National Courses of the Bank of Poland on the day of publication of the contract notice. If the date of publication of the notice is Saturday or a day off, then the currency conversion rate The Contracting Authority will accept the average rate of the National Bank of Poland on the first working day after the day of publication of the contract notice.

How offers are scored

  • The number of points that can be obtained in the price criterion is maxima..100%

What this buyer bought before

Recent IT contracts awarded by the same buyer, from published award notices.

  • Dostawa i wdrożenie Zintegrowanego Systemu Informatycznego dla Miejskiego Zakładu Komunalnego Sp. z o.o. w Stalowej Woli

    Winner: UNISOFT Sp. z o.o

    PLN 3.3m

    8 Oct 2025

Win it with SalesDots

Read the documents for you

SalesDots fetches the tender documents (or takes your upload when a platform does not allow it) and answers the two questions that matter first: what the buyer wants built, and what you must prove to take part, each with the exact quote and page.

Analyse documents

Match it with your profile

Every certificate, reference and role is checked against your company: green when you have it, amber when it expires before the deadline, grey when it needs a look.

Check my fit

Prepare your response

Turn the conditions into a bid checklist with owners and due dates, draft the questions to the buyer and keep the team on one plan.

Start a response

Never miss a change

Track the deadline, amendments and answers to clarification questions, and get similar tenders and re-tenders before they are published.

Track this tender

Source: Tenders Electronic Daily (TED), Official Journal of the EU. SalesDots is not the contracting authority; offers are submitted only through the buyer's platform.