Implementation of a company-wide PPS and resource management tool
At a glance
Hamburger Stadtentwässerung AöR (Hamburg, Germany) is tendering: Implementation of a company-wide PPS and resource management tool. Offers are due 9 Nov 2026, 10:00 CET. 96-month contract, 2 lots. Bidders must show, among other things: BSI IT-Grundschutz, ISO 27001, ISO 9001, references, insurance.
Already a customer? Open it in the app
Translated from the official notice. The original text is the legally binding one.
Key facts
- Deadline
- not published
- Estimated value
- 96 months
- Duration
- Open procedure
- Procedure
- 7 Oct 2026
- Published
- 690902-2026
- Notice number
- B43_HSE-2026-210-0014
- Reference number
- Computer-related services (72500000)
- Main CPV
- DE600
- Place of performance (NUTS)
- 2
- Lots
- not allowed
- Variant offers
- German
- Language of offers
The buyer did not publish an estimated value in the notice.
Dates
Every date of the notice and its changes, in order. Times: Brussels / Warsaw.
Notice published
Opening of offers
Deadline for offers
What the buyer wants
Purchasing association HAMBURG WASSER, consisting of the companies Hamburger Stadtdrainung AöR (HSE) and Hamburger Wasserwerke GmbH (HWW) advertises the aforementioned services under the auspices of the HSE. Basic term of the contract = 48 months. Maximum contract duration = 96 months. After 48 months, the clients are entitled at any time to terminate the contract with a period of 6 months at the end of a calendar month.
Initial situation: There is currently no central tool for project, resource management and project portfolio management at HAMBURG WASSER (Equality Group of core companies HWW and HSE). In the individual areas, Excel and similar tools are used as a tool. With the introduction of a central project portfolio management at HAMBURG WASSER, the use of software is indispensable and indispensable for the success of functioning processes.
The tool to be introduced must be easy to use and give users a good overview of their tasks and the current status of the respective portfolios, projects, budget utilization and resource utilization. The solution is intended to create transparency about ongoing and planned projects, enable prioritized control of the project portfolio and ensure efficient planning and utilization of resources.
Target image: The aim is to set up the software operationally in accordance with the agreed functional requirements while making the greatest possible use of standard functions of the software in order to ensure maintainability, updateability and future-proofness. Expected scope of performance: setup, configuration and initial operation of the software. After provision of the software, an initial set-up and configuration is necessary to meet the professional and organizational requirements of the clients.
For this purpose, the clients provide a project management that represents, prioritizes and releases the requirements. The contractor assumes responsibility for the technical configuration of the software in close coordination with the project management of the client.
CPV codes
- 72500000Computer-related servicesmain
- 48000000Software package and information systems
- 48300000Document creation, drawing, imaging, scheduling and productivity software package
Lots (2)
The contract is divided into 2 lots. Offers may be submitted for selected lots where the documents allow it.
Lot 1Implementation of a company-wide PPS and resource management tool
- Estimated value:
- not published
- Duration:
- 96 months
- Place (NUTS):
- DE600
- CPV:
- 72500000 · Computer-related services
Die Einkaufsgemeinschaft HAMBURG WASSER, bestehend aus den Unternehmen Hamburger Stadtentwässerung AöR (HSE) und der Hamburger Wasserwerke GmbH (HWW) schreibt unter der Federführung der HSE vorgenannte Leistung aus. Grundlaufzeit des Vertrages = 48 Monate. Maximale Vertragslaufzeit = 96 Monate. Nach Ablauf von 48 Monaten sind die Auftraggeber jederzeit berechtigt, den Vertrag mit einer Frist von 6 Monaten zum Ende eines Kalendermonats zu kündigen. Ausgangssituation: Aktuell gibt es bei HAMBURG WASSER (Gleichordnungskonzern der Kerngesellschaften HWW und HSE) kein zentrales Tool für Projekt-, Ressourcenmanagement & Projektportfoliosteuerung. In den einzelnen Bereichen werden Excel und ähnliche Tools dafür als Hilfsmittel eingesetzt. Mit der Einführung einer zentralen Projektportfoliosteuerung bei HAMBURG WASSER ist der Einsatz einer Software unabdingbar und zwingend für den Erfolg funktionierender Prozesse. Das einzuführende Werkzeug muss einfach zu bedienen sein und den Anwendern eine gute Übersicht über ihre Aufgaben und den aktuellen Stand der jeweiligen Portfolios, Projekte, Budgetauslastungen und Ressour-cenauslastung geben. Die Lösung soll Transparenz über laufende und geplante Projekte schaffen, eine priorisierte Steuerung des Projektportfolios ermöglichen und eine effiziente Planung und Auslastung von Ressourcen sicherstellen. Zielbild: Ziel ist die betriebsbereite Einrichtung der Software gemäß den vereinbarten funktionalen Anforderungen unter größtmöglicher Nutzung von Standardfunktionen der Software, um Wartbarkeit, Updatefähigkeit und Zukunftssicherheit sicherzustellen. Erwarteter Leistungsumfang: Einrichtung, Konfiguration und Initialbetrieb der Software. Nach Bereitstellung der Software ist eine initiale Einrichtung und Konfiguration erforderlich, um den fachlichen und organisatorischen Anforderungen der Auftraggeber gerecht zu werden. Die Auftraggeber stellen hierfür eine Projektleitung zur Verfügung, die die Anforderungen fachlich vertritt, priorisiert und freigibt. Der Auftragnehmer übernimmt die Verantwortung für die fachlich‑technische Konfiguration der Software in enger Abstimmung mit der Projektleitung der Auftraggeber.
Lot 2
- Estimated value:
- not published
- Duration:
- 96 months
Conditions for participation & required documents
What the notice asks bidders to prove, and the documents it requires. Full text below.
Conditions in the notice
- CertificatesBSI IT-Grundschutz · ISO 27001 · ISO 9001
- ReferencesSimilar contracts delivered before
- InsuranceProfessional or liability insurance
Detected automatically in the published notice. Always confirm against the tender documents.
Show the notice text (10)
Proof DIN EN ISO 9001 or equivalent - please attach!
See the necessary information in the rating table (appendix for performance description).
Submission of at least three project references. More details can be found in the file "Scoring Table as an attachment to the performance description..." and explained in more detail there.
Please indicate as a self-declaration whether you intend to subcontract parts of the overall contract to subcontractors. Subcontractors shall attach a declaration of commitment according to which they are willing to provide the services in the case of a contract. If the tenderer intends to have parts of the service performed by subcontractors, he must indicate the nature and extent of the respective services.
Proof DIN EN ISO 9001 or equivalent - please attach! If your company has valid proof of the application and/or certification of a quality assurance system according to DIN EN ISO 9001 or equivalent, it must be attached as an attachment. Alternatively, you confirm that your own quality management system is established in your company. Please create a max for this. 2-page self-declaration, in which you execute which measures exist for the qualitative assurance of the work processes in your company.
In particular, please address the following aspects: handling errors, customer orientation, accountability of leadership, involvement of the people involved, process-oriented system flows and system-oriented management approach, continuous improvement. Where confirmatory certificates are available, they shall be attached.
Data protection and information security that the following aspects are complied with and attach the required proof to the offer. Please note that evidence also from evl. subcontractors must be attached to the tender. a The contractor, as well as any subcontractors employed, must have a valid ISO27001 certification (or equivalent). This must be settled.
The certification process for ISO 27001 must be demonstrated. b The contractor, as well as any subcontractors employed, must operate a data protection management system that complies with the GDPR.
Deletion periods must be specified in writing and according to the requirements of the GDPR in the list of processing activities according to art. 30 GDPR are included. c) The contractor, as well as any subcontractors employed, must ensure suitable technical and organizational measures (TOM) that correspond to the state of the art and are compliant with laws and regulations, e.g. the GDPR. d Data processing must take place exclusively within the European Economic Area (EEA) or in countries with an adequacy decision in accordance with Art. 45 GDPR. e The contractor shall provide a data backup concept for the solutions it operates, reflecting the data backup and recovery services to be provided.
This must describe the procedures and measures for securing, storing and restoring data in a comprehensible manner. f The contractor must ensure that the evaluation of the data uses methods that are state-of-the-art (see ITGrundschutz compendium BSI OPS.1.1.5 Logging) and enable continuous traceability and reconstruction of attacks. g If it is necessary to use servers of the service provider, the data must be processed and stored within the European Union.
The server locations shall be specified and contractually guaranteed. h Direct contacts of the contractor are specified for security issues. The Contractor MUST define suitable contacts for security-related events. i The contractor must identify security gaps and emerging incompatibilities with dependent components, inform the client and provide immediate remedy.
A process must be established to ensure the flow of information during security incidents. k The contractor operates the solution and must work out fallback solutions before making changes. In the event of major, security-relevant changes, the client’s information security management must be involved in advance. l The contractor must support Transport Layer Security (TLS) in its solution in a version >1.1 (preferably 1.3). Unsafe versions of TLS must be deactivated. This is based on TR02102-2 of the BSI. In its solution, the contractor supports the security mechanism HTTP Strict Transport Security (HSTS) according to RFC 6797.
Data processing, logging, audit security, data backup and recovery The clients remain the owner of the data at all times. In its solution, the contractor must take into account the regulations required by law for logging data and document them in the concept. Protocols must be stored in an evaluable, traceable and audit-proof manner. Structured analysis and evaluation of the protocol data must be possible. In its solution, the contractor must take into account the regulations required by law for logging data and document them in the concept. The solution must provide a backup/recovery concept. The recovery must be complete and within defined technical parameters (e.g. data integrity).
For the duration of the contract, the contractor must prove liability insurance with coverage of the statutory liability for him as a policyholder with the following minimum coverage:
- Company liability insurance for personal, material and resulting property damage EUR 5.000.000 per insurance case
- IT professional liability insurance with a minimum coverage amount for property damage in the amount of EUR 500.000, - or a comparable property damage liability insurance for (pure) property damage in the amount of EUR 500.000 per insurance case. All coverage amounts are maximized at least 2 times.The existence of the insurance covers must be proven for the first time unsolicited within one month after the award of the contract by submitting a declaration by the insurer stating the risk (area of activity) and the cover sums and then immediately and unsolicited notification to the customer of any change in the insurance relationships that affects the nature, extent or existence of the insurance cover during the entire term of the contract.
Proof of Creditreform information or equivalent - please attach!
Business Registration Statement - Please attach! Please attach a current proof of registration in the professional and commercial register (not older than 6 months).
This is the SalesDots check: every condition in the notice, the company registers and your whole company profile — certificates with expiry dates, team, references and financials — in one place. The results below are an example; you see the real one after signing in.
12 met · 2 expiring · 2 missing · 2 to check
Conditions in this notice
- BSI IT-Grundschutzcertificate in the profile, valid on the bid dateIn your profile
- ISO 27001renew before you bidExpires before the deadline
- ISO 9001certificate in the profile, valid on the bid dateIn your profile
- References3 matching references from the last 3 yearsIn your profile
- Insuranceliability policy expires before the bid deadlineExpires before the deadline
Registers — checked automatically
- Handelsregistercompany active, managing directors matchVerified
- Transparenzregister (beneficial owners)entry matches the shareholdersVerified
- Wettbewerbsregister (exclusions)no entry that excludes you from public contractsVerified
- EU VAT (VIES)number active in VIESVerified
- LEI (GLEIF)LEI issued and renewed, data matches the registerVerified
- Sanctions screeningcompany and owners not listedVerified
Company profile — matched to the requirements
- ISO 22301add it or bring in a consortium partnerNot in your profile yet
- Project manager — PMP / PRINCE22 people, 5+ years of experienceIn your profile
- Solution architect — TOGAFno certified personNot in your profile yet
- IT references, last 3 years3 public-sector implementationsIn your profile
- Turnover, last 3 yearsfrom financial statementsIn your profile
- Partner status (Microsoft, SAP, Oracle)to confirm with the vendorNeeds a look
- Security clearance (Poufne, NATO)to check in the teamNeeds a look
Award criteria
The full criteria and their weights, as published in the notice.
For all lots
- Functionality60%
Please submit your "Proof of Concept" (presentation of functionalities + explanation Implementation of the project), max. 5 A4 pages (Arial font size 10).
- Price40%
See price page
Buyer
Hamburger Stadtentwässerung AöR
- Address
- Billhorner Deich 2, 20539 Hamburg, Germany
- Region (NUTS)
- DE600
- Website
- www.hamburgwasser.de
- Official contact address
- [email protected]
- The functional mailbox published in the notice. We never publish personal data.
Register identifiers
- EU VAT
- DE173526990
What this buyer bought before
30 IT contract award notices 2020–2026, €3.3m in total.
Klärwerk Köhlbrandhöft, VERA 2, Programmierunterstützung (IA-21/01-400-102)
Winner: Dietz Automation & Umwelttechnik GmbH · 1 bid
value not disclosed
30 Jul 2026
Vertragsschließung über die Modernisierung der GIS-Lösung
Winner: con terra GmbH · 7 bids
€2.8m
29 Jun 2026
Rahmenvereinbarung über Entwicklungs- und Beratungsleistungen für SAP Anwendungen
Winner: adesso SE +16 more contractors · 6 bids
€3.9mFramework agreement — maximum value
26 Mar 2026
Vertragsschließung über die Lieferung, Weiterentwicklung und Wartung eines Systems zur Prozessautomatisierung (Robotic Process Automation)
Winner: cronos automation GmbH · 6 bids
value not disclosed
20 Feb 2026
Vertrag über Beratungsleistungen für die Durchführung der Transformation SAP S/4 HANA
Winner: Arvato Systems Digital GmbH · 4 bids
value not disclosed
15 Dec 2025
Vertragsschließung über die Implementierung, Einführung und Wartung einer Software Digitaler Zwilling
Winner: NavVis GmbH · 2 bids
value not disclosed
17 Nov 2025
How to submit an offer
Offers are submitted only on the buyer's platform, before the deadline for offers.
- vergabe.hamburgwasser.de
- Platform
- yes
- Electronic submission
- no
- Electronic auction
Questions & answers
What is the deadline for offers in "Implementation of a company-wide PPS and resource management tool"?
Offers are due by 9 Nov 2026, 10:00 CET.
What is the estimated value?
The buyer did not publish an estimated value in the notice.
Who is the buyer?
Hamburger Stadtentwässerung AöR (Hamburg, Germany).
Where and how do I submit an offer?
Offers are submitted electronically on vergabe.hamburgwasser.de.
Is the contract divided into lots?
Yes, into 2 lots.
How are offers scored?
Functionality 60%, Price 40%.
Which procedure is used?
Open procedure.
Win it with SalesDots
Read the documents for you
SalesDots fetches the tender documents (or takes your upload when a platform does not allow it) and answers the two questions that matter first: what the buyer wants built, and what you must prove to take part, each with the exact quote and page.
Analyse documentsMatch it with your profile
Every certificate, reference and role is checked against your company: green when you have it, amber when it expires before the deadline, grey when it needs a look.
Check my fitPrepare your response
Turn the conditions into a bid checklist with owners and due dates, draft the questions to the buyer and keep the team on one plan.
Start a responseNever miss a change
Track the deadline, amendments and answers to clarification questions, and get similar tenders and re-tenders before they are published.
Track this tenderSource: Tenders Electronic Daily (TED), Official Journal of the EU. SalesDots is not the contracting authority; offers are submitted only through the buyer's platform. Data from the official notice, refreshed 23 Oct 2026, 23:51 CEST.